NIGERIAN PETROLEUM DEVELOPMENT COMPANY ( OML 65 ) OWOPELE NORTH-3
Owopele North 3 was drilled with a rig efficiency of 95% to a total depth of 13,600 ft, and casing shoe set at 13,589 ft.
TCP/DST was carried out to ascertain the commercial viability of oil in the reservoir. 3 plugs were set at different depths and cement was tagged at 158ft.
A total of 14 BHA runs were carried out on the wall.
For Drilling Operations, Oil Well Contracting and Rig Lease