NIGERIAN PETROLEUM DEVELOPMENT COMPANY ( OML 49 ) Oghareki(NPDC/Chevron)
Oghareki 3 was drilled in Oghareki/Okwefe field. The pilling hammer operation was performed by charlvon.
This well was drilled to a total depth of 12,200 ft-MD ( Rig efficiency was 95% )
For Drilling Operations, Oil Well Contracting and Rig Lease